nctcog logo
 
environment & development label
navigation bar
 

Trinity River COMMON VISION Program

Scolled paper look of Trinity River going through Fort WorthCorridor Development Certificate

The Corridor Development Certificate (CDC) process aims to stabilize flood risk along the Trinity River. The CDC process does not prohibit floodplain development, but ensures that any development that does occur in the floodplain will not raise flood water levels or reduce flood storage capacity. A CDC permit is required to develop land within a specific area of the Trinity floodplain called the Regulatory Zone, which is similar to the 100-year floodplain.

Under the CDC process, local governments retain ultimate control over floodplain permitting decisions, but other communities along the Trinity River Corridor are given the opportunity to review and comment on projects in their neighbor’s jurisdiction. As the Metroplex economy continues to grow and develop, the CDC process will prevent increased flood risks.

More Information

 

 
 CONTACT US | SITE MAP | LEGAL | SYSTEM REQUIREMENTS
 North Central Texas Council of Governments | 616 Six Flags Drive P.O. Box 5888 Arlington, TX 76005-5888
 Main Operator: (817) 640-3300 | Fax: (817) 640-7806