nctcog logo
 
environment & development label
 

Regional Ecosystem Framework

Watershed Roundtable Meetings - 2011

Participants at a watershed meetingNCTCOG facilitated six watershed meetings in May 2011targeting watersheds that drain to water supply reservoirs and those that drain to the Trinity River within the North Central Texas area. Meeting presentations and discussions were centered on revising two policy positions—the 1987 “Policy Position on Protection of Water Supply Reservoirs” and the 1989 “Policy Position on Trinity River Corridor.” See below for links to meeting materials [pdf].

Meeting summaries for:

Lewisville Lake, Ray Roberts Lake, and Grapevine Lake watersheds

Lake Worth/Eagle Mountain Lake and Lake Bridgeport watersheds

Trinity River Headwaters, Ten Mile/Red Oak Creeks, and East Fork below Lake Ray Hubbard watersheds

Arlington/Benbrook/Joe Pool/Weatherford Lakes watershed

West Fork below Lake Worth and Elm Fork below Lewisville Lake watersheds

Lake Ray Hubbard and Lavon Lake watersheds

 

This project was partially financed through grants from the U.S. Environmental Protection Agency through the Texas Commission on Environmental Quality.

ARRA logo
U.S. EPA logo
TCEQ logo


 
 
 CONTACT US | SITE MAP | LEGAL | SYSTEM REQUIREMENTS
 North Central Texas Council of Governments | 616 Six Flags Drive P.O. Box 5888 Arlington, TX 76005-5888
 Main Operator: (817) 640-3300 | Fax: (817) 640-7806