Roadway Corridor Projects Studies

IH 635/US 75 InterchangeThe following roadway corridor projects are either under study or under construction in the Dallas-Fort Worth region.  For more information on a corridor, click on the link to the project Website. Click here to view the corridor fact sheets.

Projects Included in Mobility 2035 - 2013 Update:
Collin County Outer Loop (Segments 1 and 3)
Dallas North Tollway
IH 30/IH 35E Horseshoe Project (Pegasus Project)
IH 35E (Northern Link)
IH 35E/US 67 Transportation Study (The Southern Gateway)
IH 635/IH 35E (LBJ  Express)
IH 820 Southeast Corridor
Loop 9
Loop 12
North Tarrant Express (IH 35W/IH 820/SH 183)
President George Bush Turnpike Eastern Extension
President George Bush Turnpike Western Extension (SH 161 Corridor)
SH 114 (Dallas County)
SH 114 (Denton County)
SH 114/SH 121 DFW Connector
SH 121 - Sam Rayburn Tollway (Collin, Dallas and Denton Counties)
SH 121 - Chisholm Trail Parkway (formerly Southwest Parkway)
SH 170 Corridor
SH 183 Corridor (Airport Freeway)
SH 190 (The East Branch) 
SH 360 South Corridor (Toll Road)
S.M. Wright Parkway
Trinity Parkway
US 75 (Collin County)
US 175 (Dallas County)

Currently Deferred Projects:
Dallas-Fort Worth Regional Outer Loop System
IH 30 Corridor (Tarrant County)
IH 30/US 80 (The East Corridor)

SH 360 Corridor 
US 67 Improvement Study (Gateway Horizon)

Other Resources:
North Texas Tollway Authority (Projects)
Dallas Area Rapid Transit
Texas Department of Transportation - Dallas District
Texas Department of Transportation (Keep it Moving - Dallas District)
Texas Department of Transportation - Fort Worth District
Texas Department of Transportation - Paris District (Hunt County)
Texas Department of Transportation (Transportation Studies)
Federal Highway Administration

Project Descriptions:
Regional Outer Loop
The Regional Outer Loop is a proposed toll road which will provide a new beltway around the Dallas-Fort Worth Metropolitan Area to help address transportation needs brought on by rapid growth in the state and region. The Regional Outer Loop System is comprised of an Eastern Subregion, a Western Subregion, Loop 9 in southern Dallas County, and portions of IH 35, IH 35W, SH 170, and SH 360. More information on the Collin County segment of the Outer Loop is now available.

Return to Top

Dallas North Tollway
The Dallas North Tollway is now open to US 380 in Prosper. Recommended improvements include extension of the tollway to the Collin/Grayson County line and widening from 6 to 8 lanes between SH 121 and Royal Lane.

Return to Top

IH 30 Corridor (Tarrant County)
The IH 30 Corridor project limits extend from Oakland Boulevard in Fort Worth to SH 161 in Grand Prairie. The proposed improvements to this facility include widening to 8 lanes between Oakland Boulevard and
IH 820, reconstructing to 10 general purpose lanes plus reversible HOV/managed lanes between IH 820 and SH 161, and a fully-directional interchange with flyover ramps at SH 360.

Return to Top

IH 30/US 80 (The East Corridor)
The East Corridor consists of IH 30 from IH 45 near downtown Dallas to Dalrock Road in Rowlett, and
US 80 from its interchange with IH 30 in Mesquite to FM 460 in Forney. The planned improvements for these corridors include reconstruction, lane expansion, and new or enhanced HOV/managed facilities.

Return to Top

IH 30/IH 35E Horseshoe Project (Project Pegasus)
Project Pegasus encompasses portions of the IH 30 and IH 35E corridors around downtown Dallas. The project limits on IH 30 are Sylvan Avenue in the west and IH 45 in the east, and on IH 35E from SH 183 in the north to 8th Street in the south. Project Pegasus will involve the reconstruction of the IH 30 Canyon, the IH 30/IH 35E interchange, and the IH 35E Lower Stemmons Corridor. More information on the IH 30/IH 35E junction and the proposed bridges over the Trinity River is available here. Preliminary construction is underway in this corridor.

Return to Top

IH 35E (Northern Link)
The IH 35E Northern Link Corridor project limits extend from the junction with IH 35 and IH 35W in Denton to IH 635 in Dallas. This corridor is planned to be reconstructed to include additional freeway lanes, new bridges, continuous frontage roads, and a concurrent HOV/managed facility throughout the corridor. Construction on this project is scheduled to begin in October 2013.

Return to Top

IH 35E/US 67 Transportation Study (The Southern Gateway)
The Southern Gateway project is comprised of IH 35E from 8th Street in Dallas to IH 20 and US 67 from
IH 35E to FM 1382 in Cedar Hill. The IH 35E section from 8th Street to US 67 will be reconstructed to provide 10 general purpose lanes. The remaining segment of IH 35E, as well as US 67, will be reconstructed to provide 6 general purpose lanes. This corridor will also feature reversible HOV/managed lanes on both IH 35E and US 67.

Return to Top

IH 635/IH 35E (LBJ Express)
IH 635 is undergoing significant changes to improve the traffic flow through this congested Dallas County corridor.  The freeway will be reconstructed from Luna Road (west of IH 35E) to Greenville Avenue (east of US 75) with the addition of HOV/managed lanes in the median and continuous frontage roads.  IH 35E between IH 635 and Loop 12 will also be improved.  Details about this project are now available.

Return to Top

IH 820 Southeast Corridor
The IH 820 Southeast Corridor project recommends improvements to sections of three freeway corridors in Arlington, Forest Hill, Fort Worth, and Kennedale: (1) IH 820 between Meadowbrook Drive and IH 20;
(2) IH 20 between Forest Hill Drive and Park Springs Boulevard; and (3) US 287 between Berry Street and Sublett Road. These improvements include expanding the number of general purpose lanes, adding reversible HOV/managed lanes, reconstruction of the IH 820/US 287 and IH 820/IH 20 interchanges, as well as new frontage roads and ramps.

Return to Top

Loop 12
This project includes the segment of Loop 12 between IH 35E and Spur 408, as well as sections of
SH 114, SH 183, and Spur 482
adjacent to the former Texas Stadium in Irving. This corridor will be reconstructed to provide 8 general purpose lanes, 4 to 8 frontage road lanes, 2 reversible tolled managed lanes, and a new interchange with IH 30.

Return to Top

North Tarrant Express (IH 35W/IH 820/SH 121/SH 183)
The North Tarrant Express project consists of plans to rebuild sections of the IH 35W, IH 820, SH 183, and SH 121 corridors in Tarrant County with additional general purpose lanes, new HOV/managed lanes, and improved ramping and interchanges. Construction along IH 820 and SH 121 from IH 35W to the SH 121/
SH 183 split is underway and is scheduled to be complete in 2015. Construction on IH 35W from US 81/287 to IH 30 is underway. The segment from US 81/287 to IH 820 is scheduled to be completed by 2016; the segment from IH 820 to IH 30 is scheduled to be completed by 2018. More information is available here.

Return to Top

President George Bush Turnpike (Eastern Extension)
The Eastern Extension of the President George Bush Turnpike (PGBT) from SH 78 to IH 30, passing through the cities of Garland, Sachse, and Rowlett, opened in December 2011. This corridor features 6 general purpose toll lanes with 4 discontinuous frontage road lanes, as well as a fully-directional interchange at IH 30.

Return to Top

SH 114 (Dallas County)
The SH 114 corridor in Dallas County will provide improved connectivity between downtown Dallas via the SH 183 corridor and Dallas/Fort Worth International Airport. The corridor will feature up to 8 main lanes, 4 tolled managed lanes, and 4 to 8 continuous frontage lanes.

Return to Top

SH 114 (Denton County)
The SH 114 roadway project will convert the existing 2-lane arterial to a 6-lane freeway. The limits of the project are from FM 156 to IH 35W in southern Denton County.

Return to Top

SH 114/SH 121 DFW Connector
The SH 114/SH 121 DFW Connector in northeastern Tarrant County is a significant project designed to reduce congestion and improve weaving around the confluence of five existing freeways north of the Dallas/Fort Worth International Airport. The primary segment of this project is the 2-mile-long section where SH 114 and SH 121 share the same freeway facility. This segment will be reconstructed to 13 general purpose lanes, 4 frontage road lanes, and 4 concurrent HOV/managed lanes. Construction on this project is approaching completion. Additional construction is planned to add tolled managed lanes to the 4-lane freeway section of SH 121 from the Dallas County line to the junction with Business 121 at the Denton County line. Construction will also extend improvements along SH 121 south to the SH 360 junction, on SH 114 west to Kimball Avenue, on IH 635 to Royal Lane, and on FM 2499 to Gerault Road. Additional information can be found here

Return to Top

SH 121 - Sam Rayburn Tollway (Collin and Denton Counties)
The Sam Rayburn Tollway in Collin and Denton counties is a 6-lane toll road extending from Coppell and Lewisville to McKinney. Planned improvements call for widening the roadway to 8 lanes by 2018.

Return to Top

SH 121 - Chisholm Trail Parkway (formerly Southwest Parkway)
The Chisholm Trail Parkway is a planned limited-access tollway between IH 30 in downtown Fort Worth and US 67 in Cleburne. This facility is scheduled to open to traffic by late 2014.

Return to Top

SH 161 Corridor (President George Bush Turnpike - Western Extension)
The SH 161 corridor is comprised of two segments. The northern segment, from President George Bush Turnpike/Belt Line Road to SH 183, will be reconstructed to add 4 toll lanes in additional to the 4 existing free lanes.. The southern segment (President George Bush Turnpike - Western Extension) consists of 4 to 6 general purpose tolled lanes and is now open to traffic. Work continues on the frontage roads at the Union Pacific Railroad in Grand Prairie with general purpose widenings planned for the future.

Return to Top

SH 170 Corridor
The SH 170 corridor project limits extend from SH 114 in Roanoke to IH 35W. The 6 existing frontage road lanes were completed in the mid 1990s. This project recommends adding 6 general purpose toll lanes between the existing frontage roads and along a new alignment west of IH 35W. Construction is expected to be complete by 2028. The interchange with SH 114 is currently under construction.

Return to Top

SH 183 Corridor (Airport Freeway)
This project encompasses SH 183 from SH 121 in Bedford to IH 35E in Dallas. SH 183 will be reconstructed to 6 to 8 general purpose lanes, 4 to 6 concurrent tolled managed lanes, and 4 frontage road lanes. Construction on some preliminary projects is under way. .

Return to Top

SH 190 (The East Branch)
SH 190 is a proposed 11-mile, 6-lane tolled facility between IH 30 and IH 20. The proposed alignment will take SH 190 through the cities of Garland, Mesquite, and Sunnyvale in eastern Dallas County and will provide access to IH 30, US 80, and IH 20 via fully-directional interchanges.

Return to Top

SH 360 Corridor
This project calls for improvements to SH 360 in Arlington and Grand Prairie between Brown Boulevard/Avenue K on the north and IH 20 on the south. Between Brown Boulevard/Avenue K and IH 30, the existing 6 lanes will be reconstructed with additional auxiliary lanes and modifications to ramps.  Between IH 30 and IH 20, SH 360 will be widened to provide 8 general purpose lanes and 4 continuous frontage road lanes. A key element of this project will be the construction of a fully-directional interchange between IH 30 and SH 360. More information on the construction now underway to improve the intersection with SH180/Division Street is available at the following link:  http://www.keep360moving.org

Return to Top

SH 360 South Corridor (Toll Road)
The recommended improvements to the SH 360 South Corridor extend from Sublett Road/Camp Wisdom Road to US 67 passing through the cities of Arlington, Grand Prairie, and Mansfield. From Sublett Road/Camp Wisdom Road to Debbie Lane, SH 360 is planned to include 8 general purpose toll lanes; between Debbie Lane and US 67, 6 general purpose toll lanes are planned.  This roadway is projected to be operational by 2020.

Return to Top

S.M. Wright Parkway
The S.M. Wright Parkway project on US 175 extends from IH 45 to SH 310 and will convert the existing limited-access freeway and frontage roads into a boulevard with signalized intersections. This reconfiguration of the S.M. Wright Freeway will be made possible when existing through-traffic on US 175 is diverted westward to IH 45 and the Trinity Parkway via a new connector being developed as part of the Trinity Parkway project. This new connector to IH 45 and the Trinity Parkway will also improve safety in the area by removing the sharp curve in the existing US 175 freeway at SH 310. The intent of this project is to reduce noise and other highway-related impacts to the area, improve neighborhood connectivity, and encourage economic activity. A corridor study is ongoing to determine the community's preferences in the boulevard's configuration and related urban design projects including parks and trails.

Return to Top

Trinity Parkway
FWTArinity Parkway is a proposed 10-mile, 6-lane toll road between the SH 183/IH 35E interchange northwest of downtown Dallas and IH 45/US 175 southeast of downtown Dallas. This parkway will serve to relieve congestion in the IH 30 and IH 35E corridors through the Dallas Central Business District. Additionally, the plans to incorporate this parkway with multiple land use strategies identified in the City of Dallas' Trinity River Balanced Vision Plan are anticipated to enhance the quality of life and economic vitality of central Dallas.

Trinity Parkway Supplemental Draft Environmental Impact Statement (SDEIS)

Return to Top

US 67 Improvement Study (Gateway Horizon)
The Gateway Horizon project limits on US 67 extend from FM 1382 in Cedar Hill to FM 157 southwest of Midlothian. From FM 1382 to the proposed Loop 9, US 67 is planned to be rebuilt to include 6 general purpose lanes, one reversible HOV/managed lane, and 4 continuous frontage road lanes. From Loop 9 south to FM 157, US 67 is proposed to be rebuilt to 6 general purpose lanes with 4 continuous frontage road lanes.

Return to Top

US 75 (Collin County)
The recommended improvements to the US 75 corridor extend from the Sam Rayburn Tollway to the President George Bush Turnpike. Sections of this corridor will be reconstructed to add additional general purpose lanes and frontage road lanes. This corridor also includes concurrent HOV/managed lanes.

Return to Top

US 175 - C.F. Hawn Freeway (Dallas County)
The C.F. Hawn Freeway expansion project extends from SH 310 to IH 20 in southeast Dallas. The freeway will be expanded from 6 general purpose lanes to 8 general purpose lanes.

Return to Top

 

5/6/2016   DHP

 CONTACT US | SITE MAP | LEGAL | SYSTEM REQUIREMENTS
Find Us on Facebook  Follow Us on Twitter  Tubin with the COG Trans  Grammin with CogTrans
 North Central Texas Council of Governments | 616 Six Flags Drive P.O. Box 5888 Arlington, TX 76005-5888
 Main Operator: (817) 640-3300 | Fax: (817) 640-7806