nctcog logo
 
transportation label
navigational bar

 

 

Transportation System Management Project Implementation Program Area

Traffic monitoringThe Transportation System Management Project Implementation program area focuses on improving the operational characteristics of the system through Transportation Systems Management strategies. The Thoroughfare Assessment Program (TAP) aims to maximize the effectiveness of arterial traffic signal systems and traffic flow through operational improvements in regional thoroughfare corridors.  An LED Traffic Signal replacement program is currently underway.  Also included in this area is development of detailed traffic flow information on the region’s freeway system obtained through the use of low-level aerial photographs. This information will be used to identify freeway system deficiencies
including system bottlenecks as well as other operational constraints.

Topics

Staff

  • Natalie Bettger, Senior Program Manager (Lead)
  • Marian Thompson, Transportation System Operations Supervisor
  • Eric Quintana, Transportation Planner
  • Gregory Masota, Transportation Planner
  • Barbara Walsh, Administrative Assistant

Contact Information

2/6/2014 01/02/2009 BW

 CONTACT US | SITE MAP | LEGAL | SYSTEM REQUIREMENTS
Find Us on Facebook  Follow Us on Twitter  Tubin with the COG Trans  Grammin with CogTrans
 North Central Texas Council of Governments | 616 Six Flags Drive P.O. Box 5888 Arlington, TX 76005-5888
 Main Operator: (817) 640-3300 | Fax: (817) 640-7806