nctcog logo
 
transportation label

 

 

Streamlined Project Delivery - Tower 55 Projects

Tower 55
Tower 55 is an at-grade intersection of several major railroads. Each day 100 to 120 freight trains pass through this location. An additional 70 commuter/passenger trains per weekday pass by on the adjacent Trinity Railway Expresss. Due to the volume of trains, each train must come to a complete stop prior to crossing. The average wait time is 15 minutes, with 90-minute delays during peak period. Long freight trains with lengthy wait times at Tower 55 are responsible for several negative impacts to the region. The purpose of the Tower 55 projects is to improve the movement of trains, within and around the current rail infrastructure, that converge on Tower 55.

Archive of previous meetings

Technical Advisory Group Meetings

Public Meeting - February 18, 2009
     Presentation [PDF, 5.5 Mb]
     Schematics

 Documents
      Tower 55 Sketch Plan
              Report [PDF,  8.5 MB]
              Appendices [PDF, 35.4 MB]

Other Presentations
        Tarrant Regional Transportation Coalition, May 2, 2007 [PDF, 9 Mb]
        Tower 55, June 2006 [PDF]
           
Tower 55 Update, May 2006 [PDF]

Other
        Tower 55 NCTCOG/TxDOT Memorandum of Understanding [PDF]
        Tower 55 NCTCOG/TxDOT Memorandum of Understanding Attachments [PDF]
        Tower 55 Policy Briefing Notes [PDF]

Staff

Jeffrey Neal, Program Manager (Lead)

 

8/13/2014  03/27/2009 cc

 CONTACT US | SITE MAP | LEGAL | SYSTEM REQUIREMENTS
 North Central Texas Council of Governments | 616 Six Flags Drive P.O. Box 5888 Arlington, TX 76005-5888
 Main Operator: (817) 640-3300 | Fax: (817) 640-7806